STATION 1 · RECEIVING BAY
1 Site survey: we walk your floor first
Before anything is quoted or installed, we walk the plant with you — lines, PLCs, sensors, network points. The rollout is shaped by your floor, not a template.
How it works
Keep scrolling — the camera walks the floor. This is exactly how a Nuvio rollout lands in your plant.
Keep scrolling — the camera walks the floor.
After the walk
STEP 1
A half-day walk of your floor with our engineers. We map lines, signals and gaps.
STEP 2
A fixed-scope quote lands after the survey. No 18-month programmes, no creep.
STEP 3
Gateway in, signals flowing, live OEE on screen — inside thirty days.
Thirty minutes, your floor plan, your lines. We'll show you where the OEE is hiding.